Ropes Course - Dream Pipes

First | Previous Picture | Next Picture | Last | Thumbnails


This was the first ropes course even we did, this was done with a partner, and the span between the vertical pipe or pole required teamwork and coordination to make your way acorss the wire without falling. Each person was in a full body harness (not comfortable) and belayed below by several individuals since this time the ropes were on pulley without the loop and the friction of the walls.